What to Do After Failing the CCP Exam: Your Resit Options, Explained

By 3FOLD Training's AACE-certified curriculum team · reviewed against the CCP Candidate Handbook · Updated 4 September 2026 · 8 min read

Quick answer: If you didn't pass the CCP exam and your 6-month registration period hasn't expired, you don't need to start over. Under normal operation you're eligible for up to 2 resits at a reduced $260 fee each (member or non-member), for a maximum of 3 total attempts (1 initial plus 2 resits). AACE releases CCP results on a pass/fail basis only, so your official result won't tell you which of the 7 domains pulled your average down — that diagnostic has to come from your own preparation, not from AACE. Update (September 2026): AACE paused CCP exam scheduling, delivery and grading from July 8, 2026 for an exam-integrity review. Applications reopen September 17, 2026 and exam delivery resumes October 1, 2026; AACE has said affected registration periods will be extended so candidates aren't disadvantaged by the pause — see AACE's official update page before assuming any of the timelines below apply to you right now.
Free Course Info

Get CCP® Training Details

Syllabus · LMS · Pricing — no spam.

Phone *

Your details are kept private and never shared.

First: you almost certainly don't need to start over

A CCP exam fail feels like a bigger setback administratively than it usually is. As long as your 6-month registration period — which runs from your original clearance date — hasn't expired, failing doesn't put you back at square one. There's no fresh eligibility review, no new application, and no need to re-verify your experience. Under normal operation, you simply pay the resit fee and AACE sends you a new clearance email to schedule your next attempt — though as of September 2026, resit scheduling itself is affected by AACE's temporary exam pause (see the note below).

Step 1: Check your registration status

Your registration period is valid for six months from your clearance date. Everything below only applies while you're inside that window — if it's already expired, skip to the section on starting a new registration. If you're not sure of your exact expiration date, it's in your original clearance email and on your Kryterion test-taker profile. For the eligibility rules that governed your original registration, see our CCP eligibility requirements guide — none of it needs repeating for a resit within your window.

Your resit options and cost

AttemptFee
1st attempt (initial registration)$525 members / $690 non-members
2nd attempt (1st resit)$260 — same fee for members and non-members
3rd attempt (2nd resit)$260 — same fee for members and non-members
New registration, after a 3rd fail or expiryFull fee again — $525 members / $690 non-members

AACE allows up to 3 total attempts within a single registration period — your initial sitting plus 2 reduced-fee resits — provided every attempt is taken before your registration's expiration date. Under normal operation, there's no separate waiting period beyond the time it takes to receive your results and pay the resit fee. That is not the case right now: AACE paused CCP exam delivery from July 8, 2026 through October 1, 2026 for an exam-integrity review, so a real waiting period is currently in effect for every candidate, not just those affected by the review itself. If your registration window falls inside this pause, check AACE's official update page — AACE has said it will extend affected registration periods.

Why your official result won't tell you what went wrong

It's tempting to assume your results will show which of the 7 domains dragged your average down — they won't. It's the policy of AACE's Certification Board to release CCP results on a pass/fail basis only; no individual or domain-level scores are provided for the official exam. That's a deliberate accreditation-driven policy, not an oversight, so don't wait for a breakdown that isn't coming.

What this means practically: the diagnostic work has to come from you, not AACE. A fresh, full-length timed practice simulation with per-domain scoring — the kind built into a proper prep course, not AACE's own exam — is the closest thing to the feedback AACE doesn't give you. See our CCP mock exam strategy guide for how to run one and read the results usefully.

A practical plan for your resit

  1. Don't rebook in a panic. Check how much registration time you actually have left, and note the monthly grading-cycle timing below so you don't waste weeks waiting on results you could've planned around. As of September 2026, also confirm the current status on AACE's official update page — CCP exam delivery is paused until October 1, 2026, so "weeks" may currently mean longer.
  2. Run a fresh full-length mock with domain scoring. This is your real diagnostic, since AACE's own result won't give you one — see our mock exam strategy guide.
  3. Target your weakest self-identified domains specifically, rather than re-studying everything evenly — our CCP syllabus guide breaks down exactly what each domain covers.
  4. If the memo was your likely weak point, practice it in isolation. It's graded as its own full domain — our CCP memo writing guide covers the structure graders expect.
  5. Only schedule your resit once you've closed a specific, identified gap — not simply because your registration clock is ticking.

What if you fail a third time, or your registration expires

If you don't pass within your 3 total attempts, or your 6-month registration period runs out first (whichever happens first), you'll need to begin an entirely new registration and pay the full exam fee again — there's no discounted rate for a fresh registration, even if you were close on your last attempt. AACE doesn't offer refunds on exam fees already paid, for a resit or otherwise, so treat each attempt as a real commitment rather than a low-stakes try. If your registration expires during AACE's July 8 – October 1, 2026 exam pause, AACE has said it will adjust affected registration periods rather than penalise candidates for the delay — confirm your specific case directly with AACE.

Results timeline: when you'll actually know

Under normal operation, the multiple-choice portion is computer-scored instantly, but your memo is graded by AACE volunteer graders in monthly cycles beginning around the 15th, with results released roughly 2–3 weeks after that cycle closes. Sit your resit right after a monthly cutoff and your memo rolls into the following cycle — factor that lag into your planning so you're not caught scheduling a third attempt with only days left on your registration. As of September 2026, this timeline doesn't apply: AACE paused CCP exam delivery and grading from July 8, 2026 during an integrity review; exam delivery is set to resume October 1, 2026. See AACE's official update page for the current status before planning around any of these dates.

When structured preparation makes the difference

A resit isn't a worse starting point than your first attempt — in some ways it's better, because you now know the exam format, timing pressure and memo expectations firsthand, and you have a specific gap to close instead of the whole syllabus in front of you. If you want a domain-weighted plan with full-length simulations that actually show you where you stand — the exact feedback AACE's own result won't give you — see CCP Complete Self-Paced Preparation.

This is one part of the bigger picture — see our complete CCP Certification Guide for eligibility, exam format and preparation, all in one place.

Frequently asked questions

How many times can I retake the CCP exam?+
Up to 3 total attempts within your 6-month registration period — your initial sitting plus 2 reduced-fee resits — as long as every attempt is taken before your registration expires. Note: AACE paused CCP exam delivery from July 8, 2026 through October 1, 2026 for an integrity review, and has said affected registration periods will be extended — check AACE's official update page if this affects your window.
How much does a CCP exam resit cost?+
$260, the same fee for both AACE members and non-members. Your original first attempt is $525 for members or $690 for non-members. Fees are unaffected by AACE's current temporary exam pause; only scheduling and delivery dates are.
What happens if I fail the CCP exam 3 times?+
If you don't pass within your 3 total attempts, or your registration period expires first, you must begin a brand-new registration and pay the full exam fee again — there's no reduced-fee option for a new registration.
Will AACE tell me which domains I failed on the CCP exam?+
No. AACE's Certification Board releases CCP results on a pass/fail basis only — no individual or domain-level scores are given. Domain-level feedback only comes from practice exams, not your official AACE result.
Can I get a refund if I fail the CCP exam?+
No. AACE does not offer refunds on exam fees already paid, whether for an initial attempt or a resit.
Do I need to redo my eligibility application to resit the CCP exam?+
No — if you're still within your original 6-month registration period, you simply pay the resit fee and receive a new clearance email to schedule your next attempt. No new eligibility review is required. This process itself is currently paused: see the note on AACE's exam suspension above.
How long does it take to get CCP resit results?+
Under normal operation, memos are graded in monthly cycles beginning around the 15th, with results typically released 2–3 weeks after that cycle closes. As of September 2026, grading is affected by AACE's temporary exam pause (July 8 – Oct 1, 2026) — check AACE's official update page for the current timeline.
Is it common to fail the CCP exam on the first attempt?+
AACE doesn't publish an official public pass-rate statistic, so treat any specific percentage quoted elsewhere with scepticism. What's clear from the exam's structure is that a resit is a normal, built-in part of the process, not a rare exception — that's exactly why AACE prices resits at a reduced fee.
Is the CCP exam currently available to schedule?+
As of September 2026, no — AACE temporarily paused CCP exam delivery from July 8, 2026 during an exam-integrity review. Per AACE's official update, CCP applications reopen September 17, 2026 and exam delivery resumes October 1, 2026. See AACE's CCP Examination Updates & FAQs page for the latest before making any plans.

Prepare with an AACE-Approved Provider

2026-blueprint study guide, video lessons, 3 full-length simulations, memo mastery — $590, 180 days.

Sources: AACE International CCP Candidate Handbook (rev. June 2026) and AACE's official CCP certification pages. CCP® is a registered mark of AACE International. More CCP articles →