About the CCP® exam
What is the CCP certification?+
The Certified Cost Professional (CCP®) is AACE International's flagship credential for cost engineering and total cost management. It validates expertise across the full project cost lifecycle and is recognized worldwide across construction, oil & gas, EPC, infrastructure, and energy sectors.
What is the CCP exam format under the 2026 blueprint?+
The exam consists of 119 simple and scenario multiple-choice questions plus 1 written memo, taken in up to 5 hours. AACE recommends allowing 40–60 minutes for the memo. The exam is delivered at a testing center or via online proctoring.
What are the CCP exam domains and their weights?+
Under the May 2026 blueprint there are six scored domains plus the memo: Managing Project Costs (36%, 43 questions), Interface with Other Disciplines (24%, 28), Performance Measurement & Analysis (17%, 20), Create Reports & Documentation (11%, 13), Inform the Risk Management Process (7%, 9), Support the Scheduling Process (5%, 6) — and the Communication memo, a graded writing task. Your study time should follow the weights.
What score do I need to pass?+
An overall average of 70% or higher across the 7 domains. You can score below 70% in individual domains and still pass, as long as your overall average clears 70%.
Is the CCP exam open book?+
No — it's closed book, but on-screen formula sheets are provided during the exam. You may bring any stand-alone, battery-operated calculator (one is not provided), and scratch paper with a pen or pencil is permitted. You'll also need your AACE ID number for the memo.
What are the eligibility requirements?+
AACE requires 8 years of industry-related experience, or 4 years of experience plus a 4-year industry-related degree. Experience must be verified by your employer — a CV or job description alone is not accepted. There is no technical paper requirement.
How much does the AACE exam itself cost?+
AACE charges $525 for members and $690 for non-members, with a resit fee of $260. You may take up to 2 resits within your 6-month registration period. These fees are paid to AACE directly and are separate from your training.
When do I get my exam results?+
The multiple-choice portion is computer-scored, but the memo — which you type into an on-screen text box during the exam — is graded by AACE volunteer graders in monthly grading cycles (starting around the 15th). Results are emailed based on AACE's expected results calendar — typically around the 5th of the following month.
How often do I need to recertify?+
Every 3 years — by accumulating 12 CEUs (continuing education units) through professional development, or by retaking and passing the exam.
About our course
What exactly is included in CCP Complete Self-Paced Preparation?+
Everything: a study guide built on the 2026 exam blueprint, on-demand video lessons mapped to the exam domains (based on AACE's “Skills & Knowledge of Cost Engineering”, 6th Edition), memo writing guidelines with 3 real sample memos, 3 full-length 120-question exam simulations, a downloadable formula sheet, and a Cost Engineering Terminology guide.
Is the course updated for the new 2026 exam blueprint?+
Yes. When AACE restructured the CCP exam into 7 domains (May 2026), we rebuilt our study guide and materials around the new blueprint — and you get exam update briefings whenever anything changes.
Is 3FOLD really approved by AACE International?+
Yes — 3FOLD Training is an AACE International Approved Education Provider (AEP). You can verify our listing on AACE's official AEP directory.
How long do I get access?+
180 days (6 months) of 24/7 access on any device — deliberately matching AACE's 6-month exam registration period. The program is fully self-paced — study whenever suits you.
Are the exam simulations like the real exam?+
Yes — three full-length, timed simulations of 120 questions and 5 hours each, with the formula sheet, plus guidance and samples for the written memo. After each simulation you get a results page showing every correct and wrong answer.
Is there live instruction?+
The program is self-paced by design, built for working professionals across timezones. Our advisors and coordinators are available on WhatsApp and email throughout your preparation.
Payment & access
How much does the course cost?+
CCP Complete Self-Paced Preparation is a one-time payment of $590 for 180 days of access. No subscription, no hidden fees.
How can I pay?+
By credit or debit card through Telr, our secure PCI-DSS compliant payment gateway. Access is activated after successful payment.
Is my payment information safe?+
Yes. Payment is processed entirely on Telr's secure hosted payment page — we never see or store your card details.
Online payment doesn't work in my country. What now?+
No problem — contact us or message us on WhatsApp and we'll arrange an alternative payment solution.
What is your refund policy?+
Our refund and cancellation policy is published on this site. If anything is unclear, ask us before you enrol.
Still have a question?
A real CCP advisor (not a bot) answers on WhatsApp — usually within minutes during business hours.