How to Apply for the AACE CCP Exam: A Step-by-Step Walkthrough

By 3FOLD Training's CCP curriculum team · reviewed against the CCP Candidate Handbook · Updated 12 November 2026 · 8 min read

Quick answer: You apply for the CCP® online through AACE International's portal. Set up a profile, add each employer and your degree with supporting documents, accept the terms and pay the exam fee ($525 for AACE members, $690 for non-members). AACE then reviews your application, and once you're cleared you book your exam with Kryterion, either at a test centre or online.
Free Course Info

Get CCP® Training Details

Syllabus · LMS · Pricing — no spam.

Phone *

Your details are kept private and never shared.

Two things to sort out before you apply

First, make sure you qualify. You need 8 years of industry-related experience, or 4 years plus a 4-year industry-related degree; the degree can stand in for up to 4 years of the experience. Our eligibility guide goes through the grey areas.

Second, think about timing. Your 6-month registration window starts the day AACE clears you, not the day you sit the exam. AACE's own staff recommend finishing your study before you register, so the window isn't eaten up while you're still on chapter three.

Get the employer letter right

AACE needs verification from your employer showing your dates of service, your job title and a short description of your duties. Your employer can write a letter or complete AACE's Certification Application Employment Verification Form. What AACE won't accept is your CV, your application, a job description, an employment contract or offer letter, or another body's certification.

If a previous employer has closed or simply doesn't reply, don't give up on those years. AACE's handbook explains that your current employer can verify past employment if it ran a background check when it hired you. Self-employed applicants follow AACE's Self-Employment Policy instead.

For the degree route, upload a copy of your diploma or transcripts. Anything not in English needs an official translation from a translation service. A translation you've typed yourself will be rejected.

Setting up the application

  1. On AACE's portal, click Get Started and enter your email. If you're already in AACE's system you'll get a password reset; otherwise you'll create a new profile.
  2. Write down your AACE ID (customer number) from your home screen. You'll need to type it into your exam memo, and you can't take notes into the exam.
  3. Under Apply for New Certifications, choose Certified Cost Professional (CCP).
  4. Add each employer separately with start date, end date and name, and upload the verification for each. A running total shows how much experience you've entered against the 8-year requirement.
  5. If you're using a degree, add the institution, degree type, field of study and graduation date, with your document.
  6. Once you meet the minimum, accept the Terms and Conditions, check the summary and add it to your cart.

Paying

Fee (paid to AACE)Amount
CCP exam, AACE member$525
CCP exam, non-member$690
Resit, members and non-members$260

You pay before the application goes in, and the fee is non-refundable. It covers AACE's review of your documents and the testing fee. Membership isn't required, though members pay $165 less on the exam. Our cost guide puts the whole budget together.

Clearance and booking

After payment, AACE reviews your file. According to its FAQs, clearance for professional-level certifications usually comes within a few business days if there are no problems. If something is missing, AACE will normally give you the chance to fix it.

When you're cleared, go to Check Certification Status and choose how you want to sit the exam: at a Kryterion test centre or by online proctoring. It's worth reading our online vs test centre guide before you pick. Kryterion then emails you scheduling instructions, and you book your date and time in its Webassessor system. AACE suggests booking soon after clearance so you have room for resits if you need them.

After the exam

Because the memo is marked by AACE volunteer graders once a month, results usually arrive by email two to three weeks after the grading cycle starts on or around the 15th. You'll be told pass or fail; AACE doesn't release individual scores. Pass, and you can download your certificate from your AACE profile.

Questions about eligibility can go straight to AACE's Certification Department at certification@aacei.org. For the bigger picture, see our CCP Certification Guide or 3FOLD Training's overview of the CCP exam.

Frequently asked questions

Where do I apply?+
Online through AACE International's portal. Create a profile, then choose Apply for Certified Cost Professional (CCP).
Can I use my CV as proof of experience?+
No. AACE needs verification from your employer with dates, job title and duties.
Do I pay before approval?+
Yes. Payment is due when you submit, and it isn't refundable.
How long does clearance take?+
AACE says a few business days for professional-level certifications, assuming there are no issues with your file.
Do I need to be an AACE member?+
No, but members pay $525 instead of $690.
When does my 6-month window start?+
On the day you're cleared.

Prepare with an AACE-Approved Provider

2026-blueprint study guide, video lessons, 3 full-length simulations, memo guidance — $590, 180 days.

Sources: AACE International CCP Candidate Handbook (rev. June 2026) and AACE's official CCP certification pages. CCP® is a registered mark of AACE International. More CCP articles →

WhatsAppEnrol — $590