Preparing for the Certified Cost Professional (CCP®) exam requires structured study, realistic practice, and clear understanding of the AACE exam format.
At 3FOLD Training, the CCP® preparation program is designed as a 100% self-paced structured online learning system, built specifically for working professionals.
This guide explains exactly what is included in 3FOLD’s CCP® preparation plans and how the self-paced model supports exam success.
1. Complete Domain-Based Coverage
The CCP® exam is divided into:
-
Cost Management
-
Performance Analysis
-
Interfacing with Other Disciplines
-
Communication (Memo Writing)
3FOLD’s Standard plan provides structured video lessons covering:
-
Cost estimating fundamentals
-
Economic analysis
-
Cost control systems
-
Earned value management
-
Project management interfaces
-
Contracting for capital projects
-
Leadership and integration topics
This ensures coverage aligns with AACE’s Body of Knowledge.
2. On-Demand Video Lessons (Learn Anytime)
The program includes 40+ on-demand lessons organized by domain.
Because the course is fully self-paced:
-
You can pause and replay complex topics
-
You can revise difficult calculations
-
You can study according to your work schedule
-
You are not restricted by batch timing
This is ideal for professionals balancing work and preparation.
3. Memo Writing Guidance
The CCP® exam includes a written memo component.
3FOLD provides:
-
Structured memo writing guidance
-
How to frame professional responses
-
Formatting best practices
-
3 sample in-exam memos
This reduces uncertainty in the communication domain.
4. Full 5-Hour Exam Simulations
The program includes:
-
3 full-length CCP® exam simulations
-
120-question practice format
-
5-hour time simulation
This helps candidates:
-
Build exam stamina
-
Practice time allocation
-
Improve calculation speed
-
Gain familiarity with exam pressure
Simulation practice is critical for readiness.
5. Formula Sheet Familiarity
The CCP® exam provides an on-screen formula sheet.
3FOLD includes:
-
CCP® formula sheet access
-
Practice usage during simulations
This ensures candidates are comfortable applying formulas efficiently.
6. Recorded Virtual Class Review
The Standard plan includes recorded virtual class sessions covering key topics.
This adds:
-
Concept reinforcement
-
Instructor-style explanation
-
Structured revision support
Candidates can revisit these recordings anytime.
7. Recorded Webinars
Supplementary recorded webinars cover important areas such as:
-
Project cost control
-
Earned value management
These sessions deepen conceptual clarity.
8. Certification Application Support
The Standard plan includes guidance for CCP® application submission.
This helps reduce documentation errors and delays.
Why 100% Self-Paced Works for CCP® Candidates
CCP® candidates are typically experienced professionals.
They need:
-
Flexibility
-
Control over learning speed
-
Repeat access
-
Structured alignment with exam domains
A fully self-paced system allows focused preparation without schedule constraints.
Which Plan Is Right for You?
Mock Plan: Best for final revision and exam simulation only.
Exam Plus: Ideal if you want multiple mock exams and memo guidance.
Standard Plan (Popular): Complete structured self-paced CCP® preparation program covering domains, simulations, memo guidance, and application support.
Final Thoughts
3FOLD’s CCP® program is designed as a structured, self-paced preparation system aligned with AACE exam requirements.
For working professionals seeking flexibility combined with structured coverage, a fully self-paced model provides both control and depth.
If your goal is disciplined, exam-aligned preparation without live scheduling constraints, the 3FOLD CCP® self-paced program offers a comprehensive pathway.